CENAL KARABIGA 1320 MW USK
COAL FIRED THERMAL POWER PLANT

BME Eyüboğlu Construction took part in the superstructure and infrastructure works of the project,  which was realized with the joint venture of Cengiz Holding and Alarko Holding.

CENAL KARABIGA 1320 MW USK
COAL FIRED THERMAL POWER PLANT

With great care and skill, we employ a total of 500 people, including a team of 8 engineers, a map measurement team of 10, and occupational health and safety experts, including construction iron formwork concrete work, embedded plate and frame assemblies, trapeze laying and installation of steel floors, excavation and BME Eyüboğlu İnşaat, which carries out the filling works; It provided a professional service by responding quickly to all kinds of demands within the requirements of the project.

 

PROJECT ID

  • 120.000 m³ concrete

  • 150.000 m³ scaffolding installation

  • 95.000 m2 formwork

  • 15,000 tons of iron assembly

  • 200,000 m³ excavation

  • 50,000 m³ of filling

  • 450 tons of plate frame and block assembly

  • 35.000 m2 composite sheet laying 